LV710 Freight Camera - Dry Van Swing Door Installation
Revised: 05/23/19 20
Countersink Installation:
15. Measure and record overall curbside door thickness, using an external caliper gauge. Confirm
overall curbside door thickness is > .75” and ≤ 1.125”.
16. Assemble installation hole template.
17. On the exterior of the curbside door, next to inner locking rod, mark a location 50” up from the
trailer floor.
Measure and mark location 50” up from trailer floor