EasyManua.ls Logo

Powersmart PS1130 - Page 13

Powersmart PS1130
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13
4. Install the batten (2) and hopper Flap (3) to the hopper with four
flange bolts M8 x 16 (1) in the direction shown in the figure.Pay
attention to tighten (See fig.6)
5. Install the handle (7) with 4 lock nuts M6 (5) and 4 bolts M6 × 16 (6) to the hopper. The bolt goes
through the hopper.
To attach the Discharge Bag (55), lift the Discharge Port Cover (22) and attach the Bag onto the
discharge port using the rope tie (See fig.7) .
Fig.6
Fig.7