EasyManuals Logo

PPI Zenex User Manual

PPI Zenex
46 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #22 background imageLoading...
Page #22 background image
20
Power-fail Recovery Modes
The timer facilitates 3 different power-fail recovery modes, viz., Continue, Re-start and Abort. In Continue mode, the timer
resumes to execute the balance soak time once the PV is detected within Hold Band. In Re-start mode, the timer executes the
complete set time all over again. In Abort mode, the timer stops execution until a start command is issued.
End-of-Soak Events
The output Relay/SSR modules, OP2 and/or OP3, can be configured as End-of-Soak Alarm with a settable alarm duration.
That is, upon completion of Soak Time execution, the Relay energizes (say, to activate a buzzer) for the set alarm duration.
Additionally, the controller provides ‘Output-Off’ strategy that can be enabled to force the control output OP1 off upon End-of-
Soak. The output becomes active again after issuance of Start Command for the execution of a new Soak Time Cycle.
User Manual
zenex

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the PPI Zenex and is the answer not in the manual?

PPI Zenex Specifications

General IconGeneral
BrandPPI
ModelZenex
CategoryTemperature Controller
LanguageEnglish

Related product manuals