EasyManua.ls Logo

Premier Tech Chronos OML-1140 User Manual

Premier Tech Chronos OML-1140
130 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
___________________________________________________________________________________
Version #1 October 2016
User
Manual
OML 1140
www.ptchronos.com/wecare
© 2016 by Premier Tech Chronos. Right of modification reserved. All rights reserved by Premier Tech Chronos.
Nothing may be reprinted or reproduced without the written consent of the company.
In this technical manual, we give the operator appropriate instructions for the safe and proper operation of the
equipment as well as instructions for the installation and correct maintenance of the equipment. Every person who is
authorized for the transportation, assembly, start up, operation, maintenance, upkeep and repair, as well as
shutdown, of our machines and additional components, is required to have read and understood the instructions in
the individual chapters and sections.
In order to avoid operating error and to guarantee trouble-free operation of our products, this technical manual must
always be available to the operating and maintenance personnel.
User Manual Automatic Bagging System
OML-1140 SM16-00032
CP Vietnam Corporation Hai Duong

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Premier Tech Chronos OML-1140 and is the answer not in the manual?

Premier Tech Chronos OML-1140 Specifications

General IconGeneral
BrandPremier Tech Chronos
ModelOML-1140
CategoryIndustrial Equipment
LanguageEnglish

Summary

Safety Warnings and Checks

Safety Warnings

Highlights important safety information and operational guidelines for the equipment.

Safety Lock-out Procedure

Detailed steps for safely isolating equipment power sources before maintenance.

Emergency Stop Function Testing

Procedure to verify the correct operation of all emergency stop devices.

General Information

Intended Use and Limitations

Specifies the equipment's intended purpose and restrictions on misuse.

Technical Description

Main Components and System Overview

Introduces the OML-1140 Bagger's main sub-units and module references.

Bag Specifications and Requirements

Initial Commissioning

Commissioning Checks and Procedures

Checks required for initial setup, including general condition, motors, sensors, and pressure.

Mounting Base and Floor Loading Requirements

Ensuring correct mounting and floor loading to prevent equipment failure or injury.

Manual Adjustments

Adjustment Notes and General Guidelines

Important notes regarding pre-installation, final adjustments, and air cylinder throttles.

Operation Modes

Maintenance

Maintenance Warnings and Safety Precautions

Essential safety guidelines and warnings to be followed before any maintenance.

General Maintenance Procedures

Covers general cleaning, lubrication, bearings, guides, and pneumatic components.

Fault Diagnosis

System Fault Detection and Resolution

Overview of the OML 1140's fault diagnosis system and basic troubleshooting principles.

Spare Parts