EasyManua.ls Logo

Primal PSPR0020 - Page 16

Primal PSPR0020
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ASSEMBLY DIAGRAM 9 USE A PARTNER TO HELP WITH THIS STEP
REMEMBER: Only hand tighten all nuts and bolts until whole machine is assembled
1. Attach DIAMOND PLATE (28) to REAR BASE A (20) with BOLT M12*95 (128), WASHER 12
(134)andLOCKNUTM12(138).
2. AttachBARHOLDER(50)toREARBASEA(20)withBOLTM12*95(128),WASHER12(134)
andLOCKNUTM12(138).
3. AttachHANDLESUPPORT(26)toHANDLE
FRAME(25)withBOLTM12*115(130),WASHER
12(134),LOCKNUTM12(138)andPIN(90).
4. InsertFOAMWITHCOVER(81)toADJUSTABLEFOAMTUBE(27)withFOAMCAP(OU TSIDE)
(64),FOAMCAP(INSIDE)(72)andBOLTM8*20(90).AttachADJUSTABLEFOAMTUBE(27)
toFOAMSUPPORT(25)withFASTPIN(99).