EasyManua.ls Logo

Pro World TransPro Plus 1620 - Operation Instructions; Assemble The Control Box

Pro World TransPro Plus 1620
14 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPPERATION INSTRUCTIONS
1. Assemble The Control Box
1.1 Take out control box inside of the
packing carton, then put the control box
on top of the machine in the right
position.
1.2 Fasten the control box onto the
machine with 4 screws tightly.
1.3 Connect 5 phase aviation plug and 2
phase aviation plug,then fasten tightly.
ATTENTION: The aviation plug must be
connected tightly.
CAUTION : A sway connector will cause
aviation plug burning under heavy
electricity.
www.proworldinc.com