EasyManua.ls Logo

Prodew FogMist Block - Page 31

Default Icon
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
31
Start-up Procedures
4
2
20
30
40
60
80
100
120
140
150
Turn on the water valve and check
the inlet pressure by looking at the
solenoid box gauge.
It should be 30PSI.
If it is not 30PSI, continue to step 5.
If it is 30PSI, skip to step 6.
The transformer light should turn green, indicating
that the transformer is getting power.
1
3
Plug in the timer 110V and the transformer
male port into the outlet.
Conrmthatthe
water supply has
pressure and volume,
and that everything
is plugged in and
connected.