30
System Installation
30
Plug in the timer 110V and the
transformer into the outlet.
33
Afterthecycleends,ipthetoggle
switch to the ‘OFF’ position.
1.5
1
0.5
2.5
2.0
MIST POWER
OFF
ON TIME
OFF TIME
7
4
0.5
1.5
11
31
Flip the toggle switch on the
timer to the ‘ON’ position.
1.5
1
0.5
2.5
2.0
MIST POWER
ON
ON TIME
OFF TIME
7
4
0.5
1.5
11
34
On one of the blocks, connect the
5/32in black air line to the port labeled
‘AIR’ and the 5/32in clear water line to
the port labeled ‘WATER’.
Repeat for the other block.
The system is ready to mist.
29
Turn the main water on.
32
Flush the lines for one cycle set to the
maximum settings.
This ensures that no particles, liquid
Teon,Teontape,oranyotherforeign
matter is present in the system.