EasyManua.ls Logo

Prodew FogMist Block - Page 33

Default Icon
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
33
Start-up Procedures
12
10
See page 20
for settings.
Let the system run for several cycles
until all the nozzles produce fog.
1.5
1
0.5
2.5
2.0
MIST POWER
ON
ON TIME
OFF TIME
7
4
0.5
1.5
11
Set the timer to the recommended settings.
9
11
If the air pressure is not 15-20PSI,
adjust the air pressure on the air
compressor with a 5/32in allen wrench.
Check for leaks and
ensure that proper fog
is coming from the
FogMist™ Blocks.