0000
To
0001
Installation Instructions
1. Device should be installed on DIN rail.
2. Device must be installed in an enclosure suitable for
the application and environment for which it is being
used. Connected Load shall not exceed 60 amps.
3. Confirm power is off prior to performing the
installation.
4. Use the appropriate wire size and type based on the
connected load and torque to the specified ratings.
5. Connect input and output connections and replace
finger guard covers and restore power.
6. Confirm power LED is illuminated and proceed to
programming functions.
To Enter Programming Mode
Push “Mode” button one time. There may be a delay up
to one minute while the program nishes the active cycle.
Setup will begin by displaying setting “A 0000”. Each time
the mode button is pressed, the device advances to the
next menu setting. Adjustments to the settings are made
using the UP & DOWN buttons. The mode and settings
are displayed on the LCD screen. The program mode
exits and saves settings after 7 seconds of inactivity.
Set Mode “A” to 0000 to disable dry contact
control of relay.
Set Mode “b” to 0000 to enable load lockout
mode on Generator.
Set Mode “d” to a minimum of 000.2 to
provide 12 second delay after power up.
Warning! Do not apply external voltage to the
dry contact input terminals. This will damage
the SAK-60 and void the warranty.
L1-IN
L2-IN
L1-OUT
L2-OUT
Dry Contact
Input
LCD Display
DOWN Button
UP Button
MODE Butto
n
Auxiliary Terminal
s
Main Terminals
LI OUT
LI IN
L2 OUT
L2 IN
U 240
SAK-60
Gen-Util LED
MODE
UP
DOW
N
GEN-UTI
L
Load On
Load On LED
Main Terminals
CU7 Copper Conductors Only
10-14 AWG 35 IN. LBS.
8 AWG 40 IN. LBS.,
4-6 AWG 45 IN. LBS.
2-3 AWG 50 IN. LBS.
Auxiliary Terminals
CU7 Copper Conductors Only 12-16 AWG 20 IN. LBS.
Set To: Mode Adjustment Range Adjustment Details
Quick Start Chart : Load Lock-Out on Generator Settings
Quick Start Charts are provided to assist in setting up basic functions. The complete menu is available on
the last pages of this document to assist with advanced functions and provide a better understanding of the
program ow.
A00000000
0000
A 0000
To
A 0003
000.1
To
999.9
SAK-60
Installation Programming Guide
Question and Answer IconNeed help?

Do you have a question about the PSP SAK-60 and is the answer not in the manual?

Summary

Installation Instructions

Installation Procedure

Steps for installing the device, including DIN rail mounting, enclosure suitability, power off, wire size, and connections.

Programming Mode Entry

Confirms power LED is illuminated and explains how to enter programming mode via the Mode button.

Load Lock-Out on Generator Settings

Disable Dry Contact Control

Configure setting A 0000 to disable dry contact control of the relay.

Enable Load Lockout Mode

Configure setting b 0000 to enable load lockout mode on the generator.

Startup Delay for Power Stabilization

Set mode d to provide a delay for power stabilization after startup.

Load Management (Under Frequency) on Generator Menu Settings

Dry Contact Control Configuration

Set mode A to control the relay via dry contact input.

Generator Load Lockout Configuration

Set mode b to enable load lockout mode on the generator.

Under Frequency Cut-Off Settings

Configure user adjustable or pre-set under frequency cut-off points.

Power Stabilization Delay

Set mode d for a delay to allow power stabilization after power up.

Load Restore Delay After Generator

Set mode g for delay in minutes before restoring load after generator detection.

Load Restore Delay After Overload

Set mode 0 for delay in minutes after an under frequency overload event.

Dry Contact Input Relay Control

Relay Control with Dry Contact

Configure relay control based on dry contact input states.

Dry Contact Input Delay Adjustment

Adjust delay for turning on the relay with dry contact input.

User Adjustable Under Frequency and Load Shed Delay Settings

Under Frequency Set Point 1

Set user adjustable under frequency point F1 (50.00-60.00 Hz).

Under Frequency Set Point 2

Set user adjustable under frequency point F2 (50.00-60.00 Hz).

Under Frequency Set Point 3

Set user adjustable under frequency point F3 (50.00-60.00 Hz).

Load Shed Delay for Frequency 1

Set delay time (00.1-10.0 sec) for under frequency load shed F1.

Load Shed Delay for Frequency 2

Set delay time (00.1-10.0 sec) for under frequency load shed F2.

Load Shed Delay for Frequency 3

Set delay time (00.1-10.0 sec) for under frequency load shed F3.

Under Frequency On Restore Extended Delay Setting

Load Restoration Overload Detection Delay

Set delay (0001-0010 sec) for overload detection during load restoration.

Extended Lockout Delay on Restore

Activate extended delay if under frequency occurs after restoration.

Over-Under Voltage and Brown Out Protection

Dry Contact Control

Configure dry contact control for the relay.

Load Lockout Mode

Set mode to enable load lockout.

Startup Delay on Power Restoration

Set startup delay to prevent short cycling of connected load.

Over;Under Voltage Protection Activation

Activate over/under voltage protection mode.

Under Voltage Cut-off Set Point Adjustment

Adjust set point for under voltage cut-off (0-200 VAC).

Over Voltage Cut-off Set Point Adjustment

Adjust set point for over voltage cut-off (201-300 VAC).

Restore Delay After Voltage Event Adjustment

Adjust delay before load restore after voltage event.

Flow Chart Menu

Dry Contact Input Settings

Configure dry contact input states for relay control.

Load Drop;Management Settings

Configure load drop or management on generator detection.

Under Frequency Control Settings

Configure user adjustable or pre-set under frequency cut-off.

Startup Delay

Adjust startup delay to stabilize power after power up.

Sine Wave Distortion Index

Set generator detection threshold using Sine Wave Distortion Index.

Restore Delay After Generator Sine Wave

Adjust delay to restore load after generator sine wave detection.

Over;Under Voltage Protection Enable

Enable or disable over/under voltage protection.

Under Voltage Cut-off Set Point

Set the point to detect under voltage cut-off (0-200 VAC).

Flow Chart Menu continued

Over Voltage Cut-off Set Point

Set the point to detect over voltage cut-off (201-300 VAC).

Restore Delay After Voltage Event

Adjust delay before load restore after voltage event.

Dry Contact Input Delay Adjustment

Adjust delay for turning on relay with dry contact input.

Service Adjustment S

Service adjustment for parameter S, consult technical support.

Service Adjustment c

Service adjustment for parameter c, consult technical support.

User Adjustable Frequency 1

Set user adjustable under frequency F1 (50.00-60.00 Hz).

User Adjustable Frequency 2

Set user adjustable under frequency F2 (50.00-60.00 Hz).

User Adjustable Frequency 3

Set user adjustable under frequency F3 (50.00-60.00 Hz).

Flow Chart Menu continued

Under Frequency Load Shed Delay 1

Set delay time for F1 under frequency load shed.

Under Frequency Load Shed Delay 2

Set delay time for F2 under frequency load shed.

Under Frequency Load Shed Delay 3

Set delay time for F3 under frequency load shed.

Normal Under Frequency Restore Delay

Set restore delay after under frequency load drop event.

Under Frequency Load Restoration Delay

Set delay for overload detection during load restoration.

Under Frequency Restore Extended Lockout

Activate extended delay if under frequency occurs after restoration.

UL Testing Standards and Product Certifications

Construction and Safety Standards

Details construction, category, pollution, voltage, shock protection, environmental, purpose.

SAK-60 Device Overview and Features

Device Overview and Features

Describes SAK-60 features, SRT technology, self-powering, and warranty.

Generator Detection and Load Lock-Out

Explains generator detection using Sine Wave-Distortion Index and load lock-out.

Generator Detection & Load Management

Details load management using under frequency control with fixed or adjustable modes.

Load Management Under Frequency Control

Explains load management with under frequency detection and delay settings.

Conventional Relay with Dry-Contact Control

Describes standalone relay function, dry contact control, and voltage protection capabilities.

PSP SAK-60 Specifications

General IconGeneral
Coil Voltage5V DC, 12V DC, 24V DC
Coil Power200mW
Ambient Temperature-40°C to +85°C
Mounting TypePCB
Terminal TypeSolder
Contact FormSPST-NO (1 Form A)
Contact Rating1A 125VAC / 2A 30VDC
Release Time3ms