EasyManua.ls Logo

Pulsar NS Series - User Manual

Pulsar NS Series
4 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
2010 AeroLEDs LLC 0008-0005 Page 1
Manufactured by: Installation Guide:
AeroLEDs LLC Pulsar NSP and NS Series Lights
967 East Park Center Boulevard
P/N 01-1080-C or P/N 01-1080-B
Suite # 381
LED Navigation and
Boise, ID 83706-6700
Anti-Collision Light
Phone: (208) 850-3294
www.aeroleds.com
sales@aeroleds.com
Exceeds 100 candela for position lights and 400 effective candela for strobes
Operating Instructions:
Operational Voltage: 14 & 28 Volt Systems
Position Input Current: 0.4A at 14V, 0.2A at 28V
Strobe Average Current: 0.8A at 14V, 0.4A at 28V
Strobe Peak Current: 2.25A at 14V for 0.33 seconds
CONTINUED AIRWORTHINESS:
The Pulsar NS series LED navigation and anticollision
light assembly is designed with 4 forward navigation LEDs, 2
rear position LEDs, and 18 LEDs mounted beneath the anti-
collision lens. Should any one LED fail, the unit must be
repaired or replaced. View LEDs with welding goggles for
eye safety.
INSTALLATION PROCEDURES:
1. The installation procedure described in the following text is for a
single light installation, but the procedure is identical for multiple
light installations.
2. Print out the installation template (the page 3 of this document),
however be sure to set up the printer driver to NOT use Page
Scaling so the printer will replicate the template to the proper 1:1
scale, otherwise the template will be too small. The proper scaling
can be verified by placing the included ‘Y’ Mounting Bracket over
the printout to ensure a 1:1 fit.
3. By design, the ‘Y’ Mounting Bracket locks into the NS product
body.
4. Print the template as described above and confirm a 1:1 scaling of
the printout.
5. Attach the template to the wingtip (mounting) position and mark
the screw and wire hole locations.
6. Mount the bracket using three 6-32 100 degree countersunk
screws. Ensure that the mounting bracket is grounded to
structure via the mounting screws. If necessary, route a ground
strap from one mounting screw to structure ground or terminate
the ground shield from the shielded wire bundle to a mounting
screw. Proper chassis ground is required for minimum RFI and for
protection from direct lighting effects.
7. Connect the red wire to switched power for the position lights,
connect the yellow wire to switched power for the strobe lights,
connect the black wire to the structure ground used to ground
the mount, and connect the green wire to the synchronization
wire from the other installed light(s). It is recommended that the
attached wiring diagram be followed for minimum RFI.
8. Attach the light to the mounting bracket and anchor in place with
the 8-32 hex head set screw (provided) that inserts into the rear
of the light.
9. Check all avionics systems for interference from this installation.
10. A flight check should be performed by a properly certified pilot.
Question and Answer IconNeed help?

Do you have a question about the Pulsar NS Series and is the answer not in the manual?

Pulsar NS Series Specifications

General IconGeneral
BrandPulsar
ModelNS Series
CategoryAvionics Display
LanguageEnglish

Summary

Operating Instructions

Continued Airworthiness

Installation Procedures

Template Printing and Scaling

Print installation template ensuring 1:1 scale for accurate fit verification with mounting bracket.

Mounting Bracket Installation

Attach template, mark holes, mount bracket with countersunk screws, ensuring chassis ground.

Wiring Connections

Connect red to position light power, yellow to strobe power, black to ground, green to sync wire.

Light Attachment and Checks

Secure light to bracket with set screw, check avionics for interference, and perform flight check.

Mounting Bracket Diagram

Component Overview

Diagram showing mounting bracket, composite wing panel, and wire lead specifications.

Mount-Installation Template

Template Dimensions

Detailed dimensions and clearances for the Pulsar NS-Series mount-installation template.

Recommended Wiring Diagram

System Connections

Wiring diagram for Pulsar and Suntail lights, showing connections to battery bus and structure ground.

Breaker Sizing Guidance

Note on breaker sizing based on the number of lights installed for Nav and Strobe inputs.

Related product manuals