INSTALLATION MANUAL
Eng 05/19
• Do not operate with other components not approved by the ESS systems.
(Connecting other products in parallel to Q.HOME+ ESS HYB G2 may result in abnormal operation.)
• The internet connection is required to use all functions of the ESS system.
• If you have a problem, please contact the installer.
• The Specifications of the product may be modified without prior notice to improve product quality.
NOTICE
GERMANYMODEL
SYSTEM
INVERTER
BATTERY
Q.HOME+ ESS HYB G2
Q.VOLT G2 HYB-4.6kW.1.1
Q.SAVE G2 4kWh B1.1.1
AUSTRALIA
Q.HOME+ ESS HYB G2
Q.VOLT G2 HYB-5kW.1.1
Q.SAVE G2 4kWh B1.1.1

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Q CELLS Q.HOME+ ESS HYB G2 and is the answer not in the manual?

Q CELLS Q.HOME+ ESS HYB G2 Specifications

General IconGeneral
BrandQ CELLS
ModelQ.HOME+ ESS HYB G2
CategoryInverter
LanguageEnglish

Summary

Information in this Manual

About this Manual

Overview of the installation and user manual for the Q.HOME+ ESS HYB G2.

Target Group

Specifies that the manual applies only to the Q.HOME+ ESS HYB G2.

Additional Information

Information on downloading manuals and product specification changes.

Symbols Used

Explains the meaning of various symbols used in the manual for safety and information.

Safety

Intended Use

Details the residential use and primary functions of the Q.HOME+ ESS HYB G2.

Network System Connection Diagram

Illustrates TN-S and TT network system connection diagrams for the ESS.

Safety Precautions

Lists critical safety warnings regarding high voltage, battery handling, and general precautions.

Product Overview

Introduces the components of the Q.HOME+ ESS HYB G2 system.

Basic Specifications (Germany)

Lists technical specifications for the system in Germany.

Basic Specifications (Australia & New Zealand)

Lists technical specifications for the system in Australia & New Zealand.

Grounding the PV INVERTER

Explains the grounding procedure for the PV inverter for safety.

Package Removal and Inspection

Package Removal

Instructions on how to carefully remove the system from its packaging.

Removing the INVERTER Enclosure Package

Step-by-step guide for removing the INVERTER from its packaging.

Removing the Battery Enclosure Package

Step-by-step guide for removing the Battery from its packaging.

Checking Components on the Packing List

Guidance on verifying all components against the packing list.

Checking for Damage in Delivery

Instructions for inspecting the product for any transit damage upon arrival.

Identifying Q.HOME+ ESS HYB G2

How to identify the product model and key information from its type label.

Installation

Selection of Installation Location

Guidelines for choosing a suitable and safe location for system installation.

Dimensions

Provides the physical dimensions of the Q.HOME+ ESS HYB G2 unit.

Ambient Conditions and Temperatures

Specifies the recommended ambient conditions and temperature ranges for installation.

Environmental Checks

Lists conditions to observe for optimal installation location, accessibility, and safety.

Position (Location Selection)

Details criteria for selecting the unit's position, including wall mounting and clearance.

Mounting Instructions

Provides step-by-step instructions for mounting the system securely.

Stand - Mounting Instructions

Specific instructions for assembling and mounting the system on a stand.

Electrical Connections

Overview of Electrical Connection

General introduction to the electrical connections of the Q.HOME+ ESS HYB G2.

Electrical System Connection

Details the system's connection to solar sources, home load, and grid.

Power Line Specification

Specifies recommended cables for AC/DC input/output connections.

Cable Gland Specification

Details specifications for cable glands used for sealing and protection.

Opening the Front Case Cover

Step-by-step guide on how to open the front cover of the unit.

Battery Connections

Instructions for connecting the battery system to the main unit.

Closing the Front Case Cover

Instructions for securely closing the front case cover after maintenance.

Circuit Breaker and DC Disconnect Switch

Information on AC circuit breakers and DC disconnect switches for the system.

Energy Meter Electrical Connection

Guide for installing and connecting the digital energy meter.

DC Line Connection from PV

Instructions for connecting DC lines from PV modules to the system.

Connection Method between Grid and Load

Details on how to connect the system to the grid and the load.

DRM Connection Method

Explains how to connect the system for Demand Response Mode (DRM).

Communication Connection

Internet Connection Setup

Steps and components required for establishing an internet connection.

Communication Terminal Configuration

Identifies communication terminals and short bar locations for configuration.

Energy Meter Connection

Procedures for connecting the energy meter using RS-485 interface.

Recommended Energy Meters

Lists compatible energy meters for the system.

Homepage and Online Services

Information on accessing and using the system's online homepage and services.

User Login and Password Management

Instructions for logging in and managing user passwords.

System Monitoring and Reporting

Details on checking system status, power info, and reports via the online portal.

Entering Initial Installation Information

Information Input Administrator Setup

Requirement to use a laptop or smartphone for inputting installation data.

System Information Input Stages

Outlines the two-step process for inputting system information.

PC Direct Connection Setup

Details on connecting directly to a PC for local setting adjustments.

SIM (System Install Manager) Connection

Instructions for connecting the System Install Manager for configuration.

Battery Initialization Process

Step-by-step guide for initializing the battery system via SIM and HMI.

Entering Setting Values

Configuration of essential system parameters like S/N, region, and PV install value.

Web Page Connection for Setup

Instructions for accessing the system's web interface for setup and monitoring.

Operating Test

LED Status Indications

Explains the meaning of LED status indicators on the inverter.

System Starting Procedure

Procedures for powering on and starting the system after installation.

System Shutdown Procedure

Steps to safely shut down and turn off the system.

Descriptions of Operation Modes

Details the different operating modes of the Q.HOME+ ESS HYB G2 system.

Information Display Interpretation

Guides on how to read and interpret various information displays on the HMI.

Problem Confirmation

General Events Overview

Overview of general system events, including warnings and protections.

INVERTER General Events (Protection)

Lists specific protection events and their corresponding measures for the inverter.

Battery General Events (Protection)

Lists specific protection events and their corresponding measures for the battery.

System General Events (Protection)

Lists general system protection events and recommended actions.

Maintenance

Cleaning the Cover

Instructions for cleaning the exterior of the ESS unit.

Checking and Exchanging Components

Procedures for checking and replacing key system components.

Battery Maintenance Procedures

Guidelines and precautions for maintaining the battery system.

List of Replaceable Parts

Lists parts that can be replaced for system maintenance.

Technical Specifications

PV Data (DC) Specifications

Detailed technical specifications for DC PV input.

Battery Data (DC) Specifications

Detailed technical specifications for the DC Battery data.

Grid Output Specifications

Technical specifications related to the AC grid output.

General System Data & Features

General physical, environmental specs, and key system features.

Performance Curves and Limits

Shows derating curves and charge/discharge limits by temperature.

Disassembly

General Disassembly Instructions

General instructions and safety precautions for disassembling the system.

Removing Electric Connections

Steps to disconnect all electrical connections before disassembly.

Disassembling the Main Body

Detailed steps for taking apart the main body of the system.

Packaging for Storage/Transport

Instructions on how to repack the system for transport or storage.

Storage Guidelines

Guidelines for storing the Q.HOME+ ESS HYB G2 system.

Disposal Procedures

Information on proper disposal procedures for the product and battery.

Transportation Safety

Safety precautions for transporting the system.

Contact Information

Hanwha Q CELLS Corporation Contact

Contact details for the main corporation.

Germany E-Service Contact

Contact information for technical support in Germany.

Australia Support Contact

Contact details for support in Australia.

Required Information for Support

Information required for technical support inquiries.