EasyManua.ls Logo

Q CELLS Q.PEAK DUO ML-G9 Series - Electrical Connections and Safety; 4.1 Safety; Electric Shock and Fire Risk

Q CELLS Q.PEAK DUO ML-G9 Series
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18 19INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO ML-G9.X – Q CELLS INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO ML-G9.X – Q CELLS18
Ä Ensure that all necessary safety and functional
tests have been carried out according to
applicable standards.
Note! Module damage may occur!
Ä Ensure that the plug connections are secured
away from any water-channelling surface.
Ä Integrate the system into the existing lightening
protection system in accordance with the
applicable local regulations.
Warning! Fire Risk!
Ä Do not use light concentrators (e.g. mirrors or
lenses).
Ä Ensure that the cabling is not exposed and/or
hanging and is protected from dirt, moisture
and mechanical friction.
4 ELECTRICAL CONNECTION
4.4 AFTER INSTALLATION
Ä No dry cleaning or use of rotating brushes.
Ä Modules must be cleaned manually and only
with sufficient water.
Protective Grounding
Ä The modules must be grounded in accordance with the local
statutory regulations.
DANGER!
Risk of fatal injury due to electric shock!
Ä Do not attempt to fix any problems yourself (e.g., glass cracks,
damaged cables).
Ä Please contact an installer or Q CELLS Technical Customer
Service Department.
Ä Do not disconnect modules by yourself.
Ä Please contact an installer or Q CELLS Technical Customer
Service Department.
Ä Dispose of modules in accordance with the local disposal
regulations.