EasyManua.ls Logo

Qdos Crystal - Page 10

Default Icon
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
Step 3
With the C/D FastMount® Hinge Rail resting on the floor
in the desired location, use the provided Installation
Level to make sure it is vertical. Remove the protective
liner from the adhesive tape on the level so that the level
can be attached to the rail. Use the Marking Tool to mark
the 2 screw locations.
Step 4
Remove the screws that hold the top cover on the Top
Lock and remove the top cover, as well as the Main Lock
for access to the upper screw hole. Repeat Step 3 for the
Locking Rail.
Step 5
Attach the rails using the appropriate screws per above.
Main Lock
Top Cover

Related product manuals