EasyManuals Logo

QTAC 85 EMS-C User Manual

Default Icon
23 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #14 background imageLoading...
Page #14 background image
Page | 14
To Supply Water to the 1” NPSH Discharge
1. Connect your hose fitting to the 1” NPSH discharge outlet.
2. Lay out the hose, open the discharge valve slowly (Figure 2, Item 3) to charge the
line and supply water to the nozzle.
STOPPING YOUR QTAC
1. If opened, gradually close the shut-off valve at the end of the discharge hose
2. Decrease the throttle on the pump engine to the idle position (Figure 3, Item 2).
3. Set the engine switch to the “OFF” position (Figure 3, Item 6)
Deploying the Folding Litter Carrier
1. Lower the litter carrier extension so that the two extension stops rest
against the reinforcing plate on the water tank (Figure 4, Item 2)
2. As needed, adjust the extension stops so that the litter carrier extension is
level.
3. With the litter carrier extension in the down position, adjust the locking pin
so that it engages the drilled hole in the reinforcing plate.
4. Tighten the locking pin wing nut so that the litter carrier extension is
securely held in position.
5. Raising the litter carrier extension is a reversal of the steps above.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the QTAC 85 EMS-C and is the answer not in the manual?

QTAC 85 EMS-C Specifications

General IconGeneral
BrandQTAC
Model85 EMS-C
CategoryFirefighting Equipment
LanguageEnglish