EasyManuals Logo

Quantum Trinity F90+ Quick Start Guide

Quantum Trinity F90+
2 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
It is saftey-relevant to strictly follow the Quick-Start-Guide
FLIGHT PLANNING
Weather conditions
Wind ground: max. 9 m/s (17.5 kn) (see picture)
Wind in flight: max. 12 m/s (23 kn)
Temperature: -12 °C to 50 °C (10.4 °F to 122 °F)
Do not y in rain or snow.
Be aware that there is no software restriction between
1500 m – 4000 m regarding the wind tolerance (ground).
0 m
2 m
(6.6 ft)
1500 m
(4921.3 ft)
3000 m
(9842.5 ft)
4500 m
(14763.8 ft)
4000 m
(13123.4 ft)
Wind tolerance (ground)
max. 9 m/s (17.5 kn)
Wind tolerance (ground)
max. 7 m/s (13.6 kn)
Wind tolerance (ground)
max. 5 m/s (9.7 kn)
Take-off MSL Flight timeWind speed
* Check the actual windspeed
by using the anemometer at 2 m (6.6 ft) AGL
Maximum take-off and landing altitude (max. 4000 m / 13123.4 ft)
Maximum ight altitude (max. 4500 m / 14763.8 ft)
*
MODE SET
*
MODE SET
*
MODE SET
Max. ight time
90 minutes
Max. ight time
90 minutes
Max. ight time
75 minutes
Check
Batteries
Charged
UAV battery packs (fully charged)
RC Transmitter
Laptop
Powerbank for iBase
Firmwares Updated
QBase software Updated
Mission planning in QBase 3D Check
UAV ASSEMBLY
Set up the laptop and open QBase Check
Set up the QBase modem and connect it to the Laptop Check
Set up the ADS-B receiver Check
Set up the iBase
Micro SD-card is inserted
Antenna center is exactly above the reference mark
Not shaded by objects
Stay away min. 5 meters
Power bank is connected and powered
iBase is recording (blue LED blinking)
Check
Turn on the RC Transmitter Check
Check the UAV for damages (e.g. surfaces, propeller) Check
Magnetometer Calibration (If required)
Obligatory: ight location > 50 km away from the last ight location
Calibration and take-off area is free of metal (parking decks, cars, metal structures) or
any devices causing electric or magnetic elds (power lines, generators, mobile phones)
Calibrated
to location
All parts assembled and locked Check
Remove the payload transport lock Check
Battery pack is connected (UAV will start automatically) Check
Take-off position
Take-off from the UAV transportation box.
Optional: Cover the ground with a canvas cover. Fix it with weights.
Check
TAKE-OFF
RC and QBase Modem connection Established
Camera detected
Camera > Trigger: Triggers and exposures count up in QBase and on the RC
Check
QBase nal Check
Obstacle clearance in reality
No obstacle within a radius of 20 m around Home Waypoint
Re-/transition, descent circle, flight paths: altitude 20 m higher than obstacles
Check
UAV heading
Ensure the direction of the displayed UAV corresponds with the direction of the UAV on the ground
Do not fly if the heading on the ground is not correct: critical deviation ≥ 10°
Check
Trinity F90+
QUICK-START-GUIDE

Other manuals for Quantum Trinity F90+

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Quantum Trinity F90+ and is the answer not in the manual?

Quantum Trinity F90+ Specifications

General IconGeneral
BrandQuantum
ModelTrinity F90+
CategoryAircrafts
LanguageEnglish