4
Your heater should be located either horizontally or vertically allowing
sufficient space for pipe connections and wiring, it should be secured
firmly using screws to a firm base or wall.
NOTE: See Fig. 2 for mounting instructions when securing to the wall
or floor.
The heater should be installed at a low point in the ltration system.
It should be positioned downstream of (after) the lter and upstream of
(before) any dosing or other water treatment plant. (see g.3)
Floor mount
Wall mount
Fig 2.
Product Overview
ENGLISH