EasyManua.ls Logo

Range Road EcoPro300 - Maintenance Schedule and Procedures; Pre-Use Checks; 10-Hour Maintenance

Range Road EcoPro300
18 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EcoPro
Range Road Enterprises Ltd
Box 944
Eckville AB T0M 0X0
www.range-road.ca
Page 9
Check The Following Each time the Processor is Used
What
How
Hoses
Inspect for exposed wire mesh and leaks. Replace all worn or
damaged hoses before starting engine
Hydraulic Fittings
Inspect for cracks and leaks. Reseal or replace all damaged
fittings before starting engine
Nuts and Bolts
Visually Check for loose bolts
Moving Parts
Clear debris
Ram Valley
Clean Sawdust from slider area after every use to prevent
possible jamming
Grease
Lightly lubricate Ram slider & log length adjuster every use
Chain
Check saw chain for sharpness and correct tension
Bar Oil
Ensure Bar Oil tank is full
Conveyor
If Conveyor Belt is not centered on pulleys use adjusting bolts to
correct position of belt
10 Hour Maintenance Every 10 Hours of Operation
Nuts and Bolts
Snug and Tighten all Bolts, Including Motor Mounts
Grease
Grease 3 Conveyor Bearings
Grease
Grease wheel hubs
Grease
Log Rollers
Engine Oil
Check level and cleanliness Use 10/30 Oil or as recommended
in Engine Manual
Hydraulic Oil
Check level and cleanliness Use AW Series Hydraulic Oil Only
Air Filter
Check & Clean Engine Air Filter if Necessary

Other manuals for Range Road EcoPro300

Related product manuals