
Do you have a question about the Rauch AXIS-H 30.1 EMC+W and is the answer not in the manual?
| Hopper/Tank capacity | 3000 liters |
|---|---|
| Control | Electronic |
| EMC compliance | Yes |
| Spreading/Working width | 12-42 m |
| Weighing system | Yes, integrated |
| Boom sections | Not applicable |
| Pump type | Not applicable |
| Pump capacity | Not applicable |
Procedure for checking and adjusting the basic settings of the metering slide.
Instructions for updating the implement ECU software to the latest version.
Step-by-step guide for calibrating the metering slide actuators for accurate operation.
Process for initializing the Drop Point (DP) actuators, establishing communication with the ECU.
Detailed procedure for calibrating the Drop Point (DP) actuators to ensure precise control.
Instructions for calibrating the weigh cells to ensure accurate weight measurements.
Procedure for checking weigh cell calibration, including tare and known weight testing.
Procedure for checking pressure sensors by examining AD values and pressure displays.
Troubleshooting steps for repeated starting and stopping of idle measurement.
Diagnosis and solutions for idle measurement completion issues with software version 3.00.00.
Steps to address flow factor increases on both sides, including switching to manual mode.
Solutions for flow factor decreases on both sides, addressing potential clogging and sensor issues.
Troubleshooting steps for unbalanced flow factor, including checking sensors and slide calibration.
Addressing issues with sluggish or impossible flow factor control, including speed adjustments.
Diagnosing and resolving spreading disc speed fluctuations, considering hydraulic and sensor factors.
Steps to diagnose and fix actuators that are constantly moving or buzzing.