Do you have a question about the RBI SERIES 8800 and is the answer not in the manual?
Specifies requirements for air supply from within the building for combustion.
Details air supply requirements from outdoors for combustion.
Instructions for inspecting and sizing masonry chimneys for proper venting.
Details requirements for connecting vent pipes and ensuring clearances.
Instructions for piping the pressure relief valve discharge.
Details the installation and function of the flow switch.
Specifies pump requirements for proper boiler operation and flow.
Details the installation and function of low water cutoff devices.
Explains the requirement and placement of expansion tanks.
Describes primary/secondary piping systems for boiler isolation.
Addresses preventing condensation with primary/secondary piping.
Ensures proper materials and connections for potable water systems.
Discusses water hardness and pH impact on heat exchanger and pump selection.
Details pump sizing and flow rate requirements for optimal operation.
Methods to prevent condensation and protect the heat exchanger.
Instructions for filling and purging hydronic heating systems.
Steps to take if a gas odor is detected.
Procedure for safely shutting off gas supply to the appliance.
Procedures for checking and adjusting system components.
Guidance on thermostat installation, location, and adjustment.
Describes the high limit control and its setting.
Details the installation and function of low water cutoff devices.
Steps for inspecting the combustion chamber and its components.
Procedure for removing and inspecting burners and burner drawer.
Steps for inspecting and cleaning the heat exchanger.
Indicates when heat exchangers need replacement and why.
Instructions for inspecting and replacing vent system components.
Troubleshooting steps for heat exchanger sooting.
Mandates installation of CO detectors for side wall vented gas equipment.
Specifies standards for approved carbon monoxide detectors.
Requirement for signage indicating gas vent location.