Do you have a question about the Reece Base and is the answer not in the manual?
Brand | Reece |
---|---|
Model | Base |
Category | Indoor Furnishing |
Language | English |
Prepare water inlet and waste connections for the vanity top before installation.
Place the vanity in its final position and ensure it is level, making minor adjustments if needed.
Drill pilot holes in the back of the unit and fix it to the wall using suitable screws into solid support.
The installer is responsible for all final door and drawer adjustments at the time of installation.
Seal external edges where the unit meets the floor and wall using flexible waterproof sealants.
Use soapy water or approved cleaners for the vanity top.
Clean cabinet surfaces with a damp cloth and dry; avoid abrasive materials.
Damage caused by improper treatment is not covered by the product warranty.