EasyManua.ls Logo

Regal LS4 - Page 234

Regal LS4
325 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
234
Recommissioning Checklist
Engine
• Check all components per engine manufacturer’s
owners manual especially fl uid levels.
• Run engine on “ear muffs” (flushette) before
launching. Check for fuel, exhaust, oil, and water
leaks.
Boat
• Install drain plug.
• Install battery and tighten all terminals.
• Check all equipment, switches, alarms, gauges
and breakers for proper operation.
• Add necessary chemicals and water to chemical
head.
• Add water to water tank. Turn on faucet to purge
tank. Refi ll water tank.
• Make sure all safety gear is on board and in
excellent working condition.
• After launching, check controls and systems for
proper operation through chart plotter screen/
information panel.
• If electric toilet installed fl ush to check operation.
Also, check toilet system for leaks.
• If thruster on board after launching check operation
in both port and starboard direction w/ joystick.
Trailer
• Make sure all equipment is in excellent working
condition including all winch, tongue jack, brake
actuator and lines.
• Check all trailer lighting including running, turn
signals, and brake lights.

Related product manuals