EasyManua.ls Logo

Reliable 4100CJ - 4100 CJ MAINTENANCE SCHEDULE; AT THE END OF THE DAY; EVERY WEEK

Reliable 4100CJ
55 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4100CJ MAINTENANCE SCHEDULE
RELEASE STEAM PRESSURE
To prolong the life of the boiler and its components, we recommend that this
task be performed at the end of the day.
AT THE END OF THE DAY:
Turn off the boiler
switch.
Press the steam
button until the
pressure drop
s d
ow
n
to ze
ro
.
Open the filler safety
cap slightly to a
llow
the remainin
g stea
m
to
releas
e
.
FLUSH THE BOILER UNIT
To prevent limescale deposits, the boiler should be drained every week.
EVERY WEEK:
Should be completed
in the morning or
when the boiler
is cold with zero
pressure.
The safety cap
should be open. If it
is not, please remove
the cap completely.
Turn the unit upside
down to drain all the
water in the tank.
Add clean water and
repeat if necessary
to remove any
sediment.
12

Related product manuals