EasyManua.ls Logo

Rev-A-Shelf RV 35 QT Series User Manual

Default Icon
4 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
INSTALLATION INSTRUCTIONS: 35 QT. WASTE CONTAINER PULLOUT
12400 Earl Jones Way
Louisville, KY 40299
rev-a-shelf.com
Customer Service: 800-626-1126
RV-SERIES 35 QT. WASTE CONTAINER PULLOUT
I-RVKDRB-1018
#2
TOOLS REQUIRED:
15 MIN
ESTIMATED ASSEMBLY TIME:
CARE AND MAINTENANCE:
Clean with a damp cloth and wipe
parts dry.
PARTS LIST
No. Description Qty.
A Handle 1
B Rear Basket 1
C Frame 1
D Uprights 2
E Waste Container 1
F #8 x 3/4” Truss Head Screws 4
A
C
E
F
D
B
WATCH VIDEO TUTORIALS OF
PRODUCT INSTALLATIONS
WWW.REV-A-SHELF.COM/VIDEOS
Question and Answer IconNeed help?

Do you have a question about the Rev-A-Shelf RV 35 QT Series and is the answer not in the manual?

Rev-A-Shelf RV 35 QT Series Specifications

General IconGeneral
Product TypeTrash Can
Capacity35 Quarts
PolymerYes
Lid IncludedNo
ColorWhite
Mounting TypeUndermount
MaterialPolymer

Summary

Installation Instructions

Tools Required

Lists the necessary tools for assembly, primarily a Phillips head screwdriver.

Estimated Assembly Time

Provides an estimated time of 15 minutes for product assembly.

Care and Maintenance

Instructions to clean with a damp cloth and dry parts.

Step 1: Position Frame

Set the frame inside the cabinet and locate the mounting position, checking for door interference.

Step 2: Secure Frame

Insert front and rear screws to ensure the frame is square to the cabinet front.

Step 3: Install Rear Basket

Slide frame out, remove pre-installed rear screws, and install the rear basket.

Step 4: Attach Uprights

Attach both uprights into the tubes located on the frame.

Step 5: Attach Handle and Container

Attach the optional handle and insert the waste container.

Related product manuals