EasyManua.ls Logo

Rigaku MiniFlex 600 User Manual

Rigaku MiniFlex 600
111 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Benchtop X-
ray Diffractometer
Instruction Manual
This image is an example of MiniFlex series. The actual product may differ from the image.

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Rigaku MiniFlex 600 and is the answer not in the manual?

Rigaku MiniFlex 600 Specifications

General IconGeneral
BrandRigaku
ModelMiniFlex 600
CategoryMeasuring Instruments
LanguageEnglish

Summary

Overview of MiniFlex 600

Overview of MiniFlex 600

Introduction to the MiniFlex 600 as a successor to previous models, highlighting improved performance and compact size.

Optical System using SC

Explanation of the optical geometry of the MiniFlex 600 utilizing the scintillation counter (SC) for X-ray diffraction.

Configuration Details

Standard Configuration Components

Lists the standard components included in the MiniFlex 600 system for basic operation.

Names of Parts Identification

Visual identification and naming of the main unit's components and block diagram.

List of Shipped Items

Detailed inventory of all items shipped with the MiniFlex 600, categorized by type.

Installation Conditions and Requirements

Installation Room Requirements

Specifies the necessary conditions for the installation room, including space and environmental factors.

Preparing Power Supply and Utilities

Details on power requirements, grounding, and cooling water specifications for system installation.

Installation of MiniFlex600 Procedures

Unpacking and Initial Verification

Instructions for unpacking the main unit and component parts and verifying against the shipped items list.

Detector Installation (SC and D/teX Ultra)

Step-by-step guide for installing the Scintillation Counter (SC) and the optional D/teX Ultra detector.

X-Ray Tube and Cooling System Setup

Procedures for installing the X-ray tube and connecting the cooling water hoses.

Slit, Beam Stop, and Knife Edge Installation

Instructions for installing various optical components like slits, beam stops, and knife edges.

Cable Connections and Software Setup

Guides for connecting power and computer cables and installing the system software.

Setting and Adjustment Procedures

Soller Slit Configuration

Details on types of Soller slits and how to confirm their installation.

Optics Alignment for SC Detector

Procedure for aligning optics when using the Scintillation Counter (SC).

HV/PHA Adjustment of Scintillation Counter (SC)

Steps for adjusting the High Voltage (HV) and Pulse Height Analyzer (PHA) settings for the SC.

Optics Alignment for D/teX Ultra Detector

Procedure for aligning optics when using the optional D/teX Ultra detector.

Optics Alignment for D/teX Only

Procedure for aligning optics when only the D/teX Ultra detector is used.

Discriminator Value Setting for D/teX Ultra

Instructions for setting discriminator values for the D/teX Ultra detector.

Initial Measurement Environment Setup

Setting the measurement environment, particularly when the X-ray tube type has been changed.

Real-Time 2 theta Axis Correction

Procedure for setting up real-time 2 theta axis correction for initial setup or periodic inspection.

Daily Routine: Startup and Shutdown

Starting Up the System

Step-by-step guide for powering on and initializing the MiniFlex 600 system.

Shutting Down the System

Procedures for safely powering off the MiniFlex 600 system and its components.

Daily Routine: Sample Measurement

Sample Preparation Techniques

Methods for preparing powder and block samples on various sample plates.

Slit System and Correction

Explanation of the slit system and the procedure for slit correction.

Measurement with MiniFlex Guidance Software

General Measurement Procedure

Steps for conducting a general measurement using the MiniFlex Guidance software.

Measurement Conditions Setup

Details on setting measurement conditions for qualitative analysis using SC and D/teX Ultra detectors.

Maintenance and Troubleshooting

X-Ray Tube and Scintillation Counter Care

Information on replacing the X-ray tube, cleaning filters, and general care for SC.

Confirming Alarm Information

How to check and interpret alarm information displayed by the system.

Installing Optional Attachments

Installing Optional Sample Attachments

Instructions for installing sample rotation attachments and automatic sample changers.

Installing the Counter Monochromator (Optional)

Procedure for installing the optional counter monochromator for improved data quality.

Optics Alignment for Monochromator

Notes on optics alignment and absorber usage when the counter monochromator is installed.

Arrangement of Slits for Monochromator

Diagram and explanation of the slit arrangement when using the counter monochromator.

Related product manuals