EasyManua.ls Logo

ROBB Smarrt - Page 4

Default Icon
4 pages
Print Icon
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mounting
The key part of this controller is an universal one, especially rotary standard switch element that can be
integrated in numerous frames by different manufactures as below list:
BERKER S1, B1, B3, B7 glass
GIRA Standard55, E2, Event, Esprit
JUNG A500, Aplus
MERTEN M-smart, M-Arc, M-Plan
2.Install the controller to wall(2 methods)
Method 1:Stick 3M glue on the
back of the bracket and then stick
the bracket to the wall
Method 2:Screw the bracket
to the wall
After the bracket is fixed,clip
the frame and control part to the
bracket in sequence
Use tool to open the
silicone gel battery cover
1.Remove battery insulator
Pull out the
battery insulator
Install the silicone
battery cover back
Installation
– leaving a battery in an extremely high temperature surrounding environment that can result in an explosion or
the leakage of flammable liquid or gas;
liquid or gas.
- a battery subjected to extremely low air pressure that may result in an explosion or the leakage of flammable
– disposal of a battery into fire or a hot oven, or mechanically crushing or cutting of a battery, that can result in
Risk of explosion if the battery is replaced by an incorrect type
an explosion;
CAUTION
– replacement of a battery with an incorrect type that can defeat a safeguard (for example, in the case of some
lithium battery types);