EasyManua.ls Logo

Robuschi RBS 45 AV User Manual

Default Icon
45 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
N° di serie S/N
xxxx
Anno di costruzione
Manufacturing year
2016
Tipo Type
xxxx
Manuale di uso e
manutenzione per soffiatori.
RBS AV
I
GB
GARDNER DENVER S.r.l.
Divisione ROBUSCHI
Via S. Leonardo 71/A
43122 PARMA – Italy
+39 0521 274911
+39 0521 774212
info@robuschi.com
Costruttore
Manufacturer
Indirizzo
Address
Tel. Phone
Fax. Fax
e-mail E-Mail
Istruzioni originali: Conservare per futuri riferimenti
Original instruction: Conserve for future references
S07-1A13-I
Operating and maintenance
instructions for blowers.
Istruzioni per Instruction for
Trasporto | Installazione | Esercizio | Manutenzione
Transport | Installation | Operation | Maintenance

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Robuschi RBS 45 AV and is the answer not in the manual?

Robuschi RBS 45 AV Specifications

General IconGeneral
TypeRotary Lobe Blower
Nominal size45
Maximum pressure1000 mbar
PowerUp to 11 kW
SpeedUp to 4000 rpm
Maximum vacuum-500 mbar
Noise Level75-85 dB(A) (depending on operating conditions)

Summary

Blower Characteristics

Operating Principle

Explains how the RBS-AV series blowers work using two conjugate rotors.

Construction Details

Details the blower's body, covers, seals, bearings, synchronised gears, and sumps.

Performance Limits and Working Conditions

Operating Environment and Gas

Specifies conditions for blower operation, excluding explosive, corrosive, or toxic gases.

Performance Specifications

Provides tables for theoretical blower speed, motor power, and temperature limits.

Flow Rate Adjustment

Describes methods for adjusting blower flow rate, emphasizing safe practices.

Forbidden Uses

Lists prohibited operations, associated risks (fire, explosion, damage), and necessary safety measures.

Residual Risks

Identifies hazards like entanglement, fluid ejection, thermal contact, noise, and fire/explosion risks.

Installation Procedures

Coupling Methods

V-Belt Drive Coupling

System Piping Installation

Auxiliary Piping and Cooling

Electrical Connections

Safe Electrical Installation

Emphasizes that electrical connections must be done by authorized specialists, following regulations and safety.

Operation Procedures

Pre-Operation Checks

Lists pre-operation checks including preservation state, alignment, free rotation, safety devices, and oil filling.

Initial Start-Up Guide

Outlines the procedure for the first start-up, including valve operation, rotation check, and cooling.

In-Operation Monitoring and Stopping

Stopping the Blower

Provides the correct procedure for stopping the blower, including closing valves, cooling circuit, and forevacuum system.

Maintenance Procedures

Oil Change Procedure

Details the first oil change timing and subsequent changes, including oil quantity for different sizes and types.

Component Servicing

Troubleshooting

Problem Diagnosis and Solutions

Provides a table of operating problems, their causes, solutions, and references to relevant sections.

Disassembly and Reassembly

Related product manuals