R&S ZVH Cable and Antenna Test Mode
Performing Cable and Antenna Measurements
Operating Manual 1309.6946.12 - 09 47
► Press the CAL key.
► Press the "Full 2-Port" softkey.
The R&S ZVH asks you to connect
an "Open" to port 1.
► Firmly connect the "Open" of the calibration standard to port 1.
► You can abort the calibration any time by pressing the "Cancel" softkey.
► Press the "Continue" softkey to
start calibration.
The R&S ZVH calibrates the
"Open".
► Disconnect the "Open".
Next, the R&S ZVH asks you to
connect a "Short" to port 1.
► Firmly connect the "Short" of the calibration standard to port 1.
► Press the "Continue" softkey to start calibration.
The R&S ZVH calibrates the "Short".
► Disconnect the "Short".
Next, the R&S ZVH asks you to
connect a "Load" (50 Ω termination) to
port 1.
► Firmly connect the "Load" of the calibration standard to port 1.
► Press the "Continue" softkey to start calibration.
The R&S ZVH calibrates the "Load".
► Disconnect the "Load".
Next, the R&S ZVH asks you to set up
a "Through" connection from port 1 to
port 2.
► Firmly connect the "Through" connection to port 1 and port 2.
► Press the "Continue" softkey to start calibration.
The R&S ZVH calibrates the "Through" connection.
After finishing the calibration routine, the R&S ZVH shows that calibration is
finished for a short time ( ). The status line now says (Cal) to indicate
successful calibration.