PROCEDURE FOR ROLLFORCE
. Handle it with the vehicle empty.
. Operate on horizontal and stable ground.
. Make sure the parking brakes are tightened. (tractor and trailer).
. Install the safety pin above the tractor coupling ring
Put the machine in a levelling space with a jack (lifting capacity: 5T) placed in front of
chassis.
Lay down jib adjustment axle (reference 280814).
Position the jib in a way that spreader is horizontal when he is coupled to tractor.
The jib position will be adjusted into the nearest lower hole. Thus, the spreader will be
slightly pitched up.
Put again the 4 axles in their place as well as their tightening pins.
Remove the jack.
Note: if there is a need to change the stiffness of jib suspension, the pre-stressed spring can be
changed by screwing or unscrewing the nut which is threaded into the end of the rod through
the spring.