14. Anchoring
1. Turn the disconnect switch to “ON” and press the
“UP” button to raise the platforms which provides
room under the runways for drilling.
2. Drill and install (8) eight lift anchors loosely. Do not
tighten.
3. Complete leveling measurements described under
item number 13.
Fig. 9a
Fig. 9b
Fig. 9c
4. Shim as necessary, Fig. 9c, and tighten anchors.
5. Grout if necessary.
6. Re-check for levelness.
Do not install this lift without anchoring
to required specifications. Failure could result in
personal injury or death.
19