EasyManua.ls Logo

RS SAILING Laser 2000 - Preparing for Reefing; Rolling the Sail for Reefing

Default Icon
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Cunningham
1. Pass the rope at the end of the Cunningham
purchase system through the eye at the
2. Anchor the
end of the
lf
to
t
. Cunningham tension is controlled using the
rward rope and fairlead/cleat on top of the
bottom of the mainsail luff (from port/left
hand to starboard/right hand side).
Cunningham
purchase
system by
sliding a ha
hitch knot in
mast track jus
below the
gooseneck.
Reefing The Mainsail
3
fo
cockpit centre console.
If it is windy and you feel you will be overpowered in the Laser 2000 it is wise to
ef the mainsail:
1. Remove the Cunningham
from the tack eyelet.
he
e boom track.
d
re
100mm
2. Remove the outhaul from t
clew eyelet.
3. Slide the clew outhaul slug
slide out of th
4. Un-cleat the mainsail halyar
and lower the mainsail until
the upper reefing tack eyelet
is around 100mm above the
gooseneck and the foot of the
mainsail is just beginning to
touch the thwart/sub deck as
shown.
22

Related product manuals