INSTALLATION
Input cable connection (enclose installing diagram)
1. Every machine has been disposed a power cable which must be
connected to coordinated voltage class in compliance according to input
voltage of cutting machine.
2. Make sure power cable is connected to power switch reliably and
prevent from oxidizing.
Make sure power voltage is inside the waved range.
Output cable connection
1. Make sure tube of pressed air is connected to copper connector by
high pressure rubber tube firmly.
2. Make sure copper screw of another end of torch is connected to
electrify integration terminal then tighten them clockwise relation (prevent
from leaking gas). Mobile plug of another end of grounding cable pincer is
connected to positive terminal of front panel then tighren it.
3.Make sure air plug of torch is connected to switch connector of panel (If
it is arc-supporting cutter ,arc-supporting cable of torch is connected to
terminal of arc-supporting.)
Check
1. Check if cutting machine is grounded reliably according to standard.
2. Check if all connectors is connected firmly.
3. Cheek if power voltage is correct.
Operation
1. Open the power switch of front pane,make the power switch is in "
on"position.At this time indicator of power switch is on. Screen will show
the current volume.
2. Adjust the gas pressure and make it is adequate to machine,open the
valve of pressed air
3. Press the control knob of torch,electromagnetic valve is starting,sound
of HF arc-striking can be heard and bumer of torch should flow out
gas(Burmer of arc-supporting cutter should spurt fire)
4. Make sure cutting current is adequate to machine according to
thickness of cutting piece.