Do you have a question about the safgard 550 Series and is the answer not in the manual?
Probe placement for hot water boilers, including riser and header options.
Secondary LWCO installation for steam boilers below primary LWCO level.
Details on reducing tees, Safgard tees, and probe tip clearance requirements.
Instructions for applying sealing compound and ensuring probe tip clearance.
Connects input voltage to terminals 1 & 2, jumper P1 to P2, and burner circuit.
Connects input voltage to terminals 1 & 2, P1 to burner power, P2 to burner circuit.
Wiring for 550/750 as secondary LWCO, with standard and critical differential options.
Manual reset operation: burner fires, shuts off on low water, locks out, requires manual reset.
Automatic reset and test button operation: burner fires, test simulates low water, LED lights.
Manual reset and test button operation: includes manual reset and test button functions.
Check wiring and probe clearance if burner fails to shut off during low water.
Verify probe connection, ground, and voltage if burner does not start.
Red LED signifies lock-out due to prolonged low water; correct cause before resetting.
Inspect probe annually, clean scale/build-up, and test control operation.
Details on FOEM Manifold and 1214C-2 TEE for Safgard probes.
Data for EL1214 standard, EL1214-SV, and EL1214-P probes, including NPT sizes.
Input voltage, switch ratings, contact type, and alarm circuit details.
Two-year warranty on material and workmanship from date of manufacture or installation.
| Brand | safgard |
|---|---|
| Model | 550 Series |
| Category | Plumbing Product |
| Language | English |
Loading...