EasyManua.ls Logo

Samsung RF265B Series - Page 51

Samsung RF265B Series
164 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
English 51
Operations
Provision for Open Access to the Connected Product Requirements
1. SGIP Open Standards (Smart Energy Prole 2.0 - http://www.csep.org/)
- Energy Consumption Reporting
- Demand Response
2. OPEN API
- Operational Status, User Settings & Messages
- ICE Maker Status: GET /devices/0/fridge/iceMaker
- Door Open Alarm: GET /devices/0/Door/openState
- DR Status: GET /devices/0/drlc
- Delay Defrost Capability
- Set Schedule of the Defrost Delay: POST /devices/0/fridge/defrostreservations
- Get Schedule of the Defrost Delay : GET /devices/0/fridge/defrostreservations
- Delete Schedule of the Defrost Delay: DELETE /devices/0/fridge/
defrostreservations/<<id>>
- Defrost Delay On/OFF: PUT /devices/0/fridge
Untitled-1 51 2017-02-08  12:16:30

Table of Contents

Related product manuals