28
Tidying Up the Connected Cables (S27HG50QQ* model only)
1 2 3 4 5
Stand assembly is complete.
Adjust the screen following the arrow
direction.
Rotate the machine to the highest
vertical position.
―
The monitor may get damaged if you
rotate the screen without tilt, or counter
clockwise direction
Connect the corresponding cables. Arrange the cables against the bend
tendency of the cables and pull the
cables out of the COVER-REAR SUB
grooves.
Cover the COVER-REAR SUB.
6 7 8 9 10
Open the COVER-STAND NECK LEFT, and
rotate the open part at the bottom.
Place the corresponding cables into
the stand-neck holder. Do not stretch
the cable. Three cables in one holder is
recommended.
Cover the COVER-STAND NECK LEFT. Rotate the machine to the horizontal
position.
Arrange the external cables.