EasyManua.ls Logo

Samsung Videowall User Manual

Samsung Videowall
27 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Videowall Installation Guide
This training is to provide technical competence and
flexibility to show partner’s specific skills on products.
Feb. 2021
Global Tech Sales Group
Enterprise Business Team
Question and Answer IconNeed help?

Do you have a question about the Samsung Videowall and is the answer not in the manual?

Samsung Videowall Specifications

General IconGeneral
BrandSamsung
ModelVideowall
CategoryMonitor
LanguageEnglish

Summary

Preparation for Installation

Visual Inspection for Preparation

Check panel condition after un-boxing and connecting signal. Use bottom box for inspection.

Product Rotation for Installation

Rotate the product clockwise to use it in portrait orientation for installation.

Prohibited Installation Conditions

Do not install on ceilings, floors, tables, or inclined positions. Avoid backward/forward inclination.

Ventilation Requirements for Installation

Ensure proper ventilation space (40mm min. for perpendicular, varying for indented) and ambient temp under 40°C.

On Installation

Un-boxing Procedure

Guides for un-boxing different models (UDE-A/B, VHR-R) to minimize product impact.

Wall Bracket Installation Notice

Attaching the Wall Bracket Assy is 'On Installation'. Seal breakage makes installer responsible for issues.

Wall-mounting Guidelines

Requires 2 persons, use handles, avoid touching panel/bezel. Detach protection sheet before mounting.

Handling Cautions During Installation

Be cautious of impact, especially on product edges. Avoid improper handling and dropping.

Detaching Sponges for VHR-R Model

VHR-R models have sponges on four bezel faces; detach them before installation.

Reserving Gap During Installation

Use the provided GUIDE to reserve gaps between products. Detach gap tape guide carefully.

Cautions During Stacking

Center products properly, avoid simultaneous stacking, holding bezel, or forward stacking. Ensure 90-degree upright.

Wall-mount Alignment Precautions

Prevent panel collision and damage during X,Y,Z alignment. Do not push too hard with Push-Pull mounts.

Video Signal Cable Recommendations

Use packed or certified cables. UHD Color requires specific DP cable and 'On' setting for loop-out.

Thermal Guide

Multi-Connection Thermal Considerations

Temperature increases in center/upper parts of multi-connections due to convection and restricted airflow near walls.

Wall Mount Thermal Conditions

Ambient temp under 30°C recommended. Min. distances from wall, ceiling, and ground specified for heat dissipation.

Embedded Wall Mount Thermal Conditions

Similar ambient temp (under 30°C) recommended. Distances from rear wall, side gaps specified for embedded mounts.

Appendix: Thermal Guide for Single Screen

Vertical Wall Mount Condition

Proper thermal management for commercial models; no extra consideration needed if ambient temp is under 35°C.

Related product manuals