EasyManua.ls Logo

SARGLAS ZOOM SERIES - Table of Contents

Default Icon
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SARIgas Zoom Z – ZF Page
2
Rev.0
USER INSTRUCTIONS
- Control panel, mod. Zoom Z 420A – Z 520A – ZF 420A – ZF 520A Page 3
- Turning the boiler on and off mod. Zoom Z 420A – Z 520A – ZF 420A – ZF 520A Page 4
- Useful tips for using the appliance Page 5
- Maintenance Page 5
- Changing gas Page 5
- Ventilation in the room Page 6
- Useful safety and installation tips Page 6
- Working problems Page 7
INSTALLATION INSTRUCTIONS
- Technical specifications Page 8
- Installation procedures Page 9
- Dimensions Page 10
- Layout pre-assembly template fittings Page 11
- Air intake-fume exhaust connection systems Page 12
- Coaxial pipe connection example Page 13
- Separate pipes connection example Page 14
- Max. permitted lengths for the coaxial pipe Page 15
- Max. permitted lengths for the separate pipes Page 15
- Ventilation of the rooms boilers type B
11BS
– B
22
Page. 16
- System piping Page 17
- Gas and electric supply Page 17
- Starting up – Before starting up the boiler Page 18
- Bleeding the system – antifreeze precautions Page 19
- Regulation with external control – connection diagram Page 19
- Wiring diagram mod. Zoom Z 420A – Z 520A Page 21
- Wiring diagram mod. Zoom ZF 420A – ZF 520A Page 22