EasyManua.ls Logo

Sartorius QC7CCE-S - Strain Gauge System Installation (QC7 CCE); Attaching New Strain Gauge System; Final Assembly and Checks

Sartorius QC7CCE-S
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
19
SARTORIUS QC - Scales
Now loosen the two fastening screws (116.B) far enough so that you can
remove the strain gauge system through the base pan (116).
Unscrew the retaining plates from the old strain gauge system (116) and
attach them loosely to the new strain gauge system (116).
Thread the strain gauge system connecting wire (116.A) from the top
through the base pan (116.B); set the new strain gauge system in
place (116) and screw it down loosely.
Position the strain gauge system (116) and tighten down the two
screws (116.C) to 7.5 (+0.4) Nm.
Set the pan support (118) and load spring (117) on the strain gauge
system (116) and screw them down loosely.
Position the pan support (118) and the load spring (117) and tighten
down the two screws (116.C) to 7.5 (+0.4) Nm.
Screw in the stop screws (119) until there is a gap of 0.6 mm between
the
pan support (118) and the stop screws (119).
Lay the scale on its side.
Thread the strain gauge system connecting wire through the guide under
the base pan and fasten it in place with the two cable clamps (112).
Stand the scale upright and place the weighing pan on it.

Related product manuals