Planning, transport, installation
LASERTEC 40
Page 40
Aligning and fastening
The machine base has recesses for fastening bolts and for attaching
levelling elements or fixing devices.
Preparing permitted installation elements
Position of the fastening points
Type and number of levelling elements
Installation dimensions, fastening bolts
Delivery ex-works
In case of delivery by SAUER, the installation elements are in a separate
package on the machine's pallet.
Providing suitable measuring instruments
Provide spirit level (machine spirit level)
Accuracy (mm/m): 0,02/1
Pay attention to clean bearing surfaces!