EasyManua.ls Logo

SBM B6 SX - Maintenance

Default Icon
8 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4
3. START-UP :
Manual operation
Open the main gas valve.
Switch the power on.
Start the heater ignition cycle.
If the flame is not lit after 45 seconds, start a second ignition cycle.
If the flame is still not lit or goes out, close the main gas valve, switch
the power off and call your SBM installer.
Automatic control
(VisioLon Ind-T control module)
Open the main gas valve.
Switch the power on.
Check the settings (temperature, time).
Change module programming if necessary.
4. SHUT OFF :
Close the main gas valve.
Switch the power off.
5. MAINTENANCE :
To be performed once a year by your SBM installer, according to the
SBM SX INSTALLER INSTRUCTIONS No. 05000048.
6. CHANGING THE GAS USED :
For any change in the type of gas used, please contact your SBM
installer.

Other manuals for SBM B6 SX

Related product manuals