EasyManua.ls Logo

SBM B6 SX - Page 7

Default Icon
8 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Manufacturer
SBM
3 cottages de la Norge 21490 CLENAY - FRANCE
Agent’s stamp :
Installer’s Stamp :
GAS INFRARED HEATERS
SX USER GUIDE
N° 05000004/5
(TO BE DISPLAYED NEXT TO THE CONTROL UNIT)
M A N U A L O P E R A T I O N
IGNITION :
Open the main gas valve.
Switch the power on.
Start the heater ignition cycle.
If the flame is not lit after 45 seconds, start a second ignition cycle.
If the flame is still not lit or goes out, close the main gas valve, switch
the power off and call your SBM installer.
SHUT-OFF :
Close the main gas valve.
Switch the power off.
MAINTENANCE:
To be performed once a year by your SBM installer, according to the
SBM SX INSTALLER INSTRUCTIONS No. 05000048.
.

Other manuals for SBM B6 SX

Related product manuals