EasyManua.ls Logo

Schuller 175197D - Installation Preparation; Install Hanger Bracket

Schuller 175197D
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
INSTALLATION
GUIDE
1. INSTALLATION
PREPARATION.
To avoid personal injuries and damage, ensure that the hanging position allows for at least 2.1 meters
between the floor and the blades and that there is at least 76 cm of horizontal distance between the
fan and any wall or other obstruction.(Fig.1)
Make sure the ceiling can support the weight of the fan.
2. INSTALLHANGER BRACKET:
A.INSTALLATION ON A WOODEN OR PLASTER CEILING.(Fig.2)