4. Assembly and Relocation
PRO2 Assembly
Short assembly steps will be required when the machine arrives at the customer location. The following steps will show
these steps for the PRO2 machine models.
Tools Required:
• Torque wrench set 48 ft-lbs (65 Nm)
• 12" (30.5 cm) Ratchet extension
• 5/16" (8 mm) Allen hex bit
• 12" Center Punch
Parts Required:
• Washer, Flat 3/8" (Qty. 6)
• Washer, Split 3/8" (Qty. 6)
• Screw, 3/8"-16 x 1" Socket (Qty. 6)
1. Stand up the main body of the PRO2, then remove any packaging that was on the base frame.
Page 8 of 23