24
Insert (20) Posts into
corresponding post holes
on Sides 1 & Side 2.
Also add (4) Base Support
pins to corresponding
Holes in Side 1 & Side2
Stand Side 1 on its edge and
be sure posts, dowels & pins
are aligned. First use Mallet to tap
Side 1 carefully into upper built section.
Then attach lower built section into Side 1.
x20
Posts
x4
Base Support
Pins
18
17
Side 2
Side 1
Side 1
Finished
Edge