EasyManua.ls Logo

ScrapBox WorkBox 3.0 - Page 5

Default Icon
33 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
Left Box
Left Box
Lid
Base
16 Bolts
16 Nuts
Bottom View
LEFT BOX Build on a blanket for best results
1
Left Box: Side 2
Small base support pins
2
Install small base support pins and posts into
BOTTOM of Side 2 as shown.
Install posts into TOP of Side 2 as shown.
Green dowels
Post hole
Locking
Cam hole
Unfinished edge
Pre-drilled
wheel screw
holes
Pre-drilled
angle bracket
holes
Post hole
Divider
screw
hole
Hammer (16) bolts into top of base.
Install (4) wheels onto bolts.
Tighten with (16) nuts using a
wrench or socket wrench.
Do NOT overtighten screws
(wheels should spin freely)
x2
3
With finished edges of Base & Lid facing down,
match up posts with post holes on Side 2.
Use mallet to tap Base and Lid into Side 2.
IMPORTANT
All panels must be installed at a right angle.
Damage may occur if not properly assembled.
Left Box
Side 2
x4
Posts
TOP
BOTTOM

Related product manuals