EasyManua.ls Logo

Seakeeper 6 - Page 39

Seakeeper 6
45 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
MANUAL
Product: Document #: Rev: Page:
SEAKEEPER 6 90402 1 1 of 3
Section 4: STARTUP
4.0 Introduction
This section describes the first startup of the Seakeeper.
Also reference Seakeeper Document # 90403, Seakeeper 6 Operation Manual.
Previous sections for mechanical, electrical and cooling installation must
be completed before this startup sequence is initiated.
Before continuing, covers must be installed and the area around the
Seakeeper must be clear of personnel and equipment!
4.1 Startup Instructions
1) Energize 12 VDC supply at the customer supplied electrical disconnect.
2) Supply 110-230 VAC to Motor Drive Box at customer supplied electrical disconnect.
3) If seawater pump for the Seakeeper is not supplied through cable from Motor Drive Box,
turn on the boat’s AC or DC dedicated circuit breaker that supplies power to the
seawater pump.
4) With system powered up check the display for any ALARMS. If there are any ALARMS
present they must be corrected first.
5) Press the Seakeeper ON/OFF Button on Display. The progress bar will
appear and indicate how soon the Seakeeper will be available for stabilization. When the
Seakeeper is initialized and up to minimum operating speed the stabilize button
will appear. At this point, the Seakeeper is available for stabilization.

Other manuals for Seakeeper 6