EasyManua.ls Logo

Sealey GSS1508G - Page 5

Sealey GSS1508G
13 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8.1. Rear Wall Panels
Place 1R and 1L on your work table and join together with the self tapping screws as per the diagram.
Now t 20B top channel and 20C bottom channel to the sheeting by tapping it in (diagram A) or sliding it in (diagram B). Note that the
small lip of the channel is always facing out. This is to ensure that rain water can not build up inside the shed.
Original Language Version
© Jack Sealey Limited
GSS1508G Issue: 1 - 28/08/14

Related product manuals