EasyManua.ls Logo

Sealey SSCL1.V2 - Page 11

Sealey SSCL1.V2
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9. PLATFORM PROTECTION
9.1. Install the 1st platform on the 5th rung, remaining seated on the latter, and position the braces inside the uprights on the rungs as
shown in the diagram (g.21) and assemble the 2nd platform on the 13th rung (g.22) and install the braces and toeboards around this
platform.
9.2. Make sure that the hooks are properly locked into the base!
9.3. Start from the base assembled and attach the brace to the 1st rung. Prepare the ‘2 rung’ and ‘7 rung’ ladders removing the pins and
stoppers from their bases.
NOTE: x the pins around the bottom rung of the ladder
g.21
g.22
g.23
Original Language Version
© Jack Sealey Limited
SSCL1.V2, SSCL3, SSCL4 Issue:4 28/06/21