Do you have a question about the Seascape 14 and is the answer not in the manual?
Beam | 1.98 m |
---|---|
Sail Area | 13.5 m² |
Weight | 145 kg |
Design Category | C |
Length Overall | 4.25 m |
Length | 4.25 m |
Draft (board down) | 1.05 m |
Hull Material | Fiberglass |
Capacity | 4 |
Lists essential components for the mast base assembly, including furler and stay adjuster.
Step-by-step guide for attaching furler, stay adjuster, and A-frame to the mast.
Lists components for main sail, jib, and spinnaker rigging, including halyards and stays.
Instructions for preparing mainsheet, dodger elastic rope, and front stay.
Guidance on preparing the mast, securing the boom, and attaching the front stay.
Lists blocks and ropes required for the gnav and cunningham systems.
Instructions for connecting the gnav slider, blocks, and ropes to the mast.
Steps for attaching the cunningham block and rope using shackles.
Lists components for deck rigging, including bowsprit, tackline, blocks, and furling line.
Instructions for tying the furling line and attaching the tackline to the mast base.
Steps for attaching the block and running the poleout through the assembled double block.
Lists jib block, snuffer, footstraps, and elastic ropes for deck setup.
Instructions for attaching footstraps and running elastic ropes on the deck.
Lists mainsail, jib, gennaker, and associated rigging components like sheets and cleats.
Steps for tying halyard, lifting the main sail, and adding the mainsail clew rope.
Instructions for tying mainsheet, attaching swivel, and preparing the jib for hoisting.
Steps for securing the trapeze cleat and attaching the jibsheet to the clew.
Instructions for attaching gennaker tack, halyard, and running the sheets through ratchets.
Steps for tightening gnav/cunningham, marking knots, and storing halyard ends.