17
Tie mainsheet to the boom and add mainsheet rachet.
Attach swivel to the boom with strap.
Attach trapeze cleat to the furler.
Use soft shackle to attach jib.
Prepare for lifting the jib.
Pull jib hallyard while lifting jib and closing the zipper.
7
8
9
10
11
12